Connect with us

Transmission & Energy Storage Equipment

SEIA urges Congress to include energy storage in the ITC

Published

on

In a letter filed Nov. 26, the Solar Energy Industries Association (SEIA), alongside a broad coalition of energy trade and advocacy organizations, urges Congress to modify the tax code to include energy storage as an eligible technology for the investment tax credit (ITC).

Following is a statement on the effort from SEIA president and CEO Abigail Ross Hopper:

“As our letter to Senate and House leadership details, energy storage systems are critically important to the modernization of America’s electric grid and represent a massive opportunity for clean energy, particularly solar power. In the energy world, you’d be hard-pressed to find an example of two technologies that complement each other as well as solar+storage.

“Yet without clear rules of the road, companies continue to face financial uncertainty in their investments. Inclusion in the ITC is a crucial step if we’re going to harness storage’s full potential. SEIA, alongside our partner organizations, is urging Congress to enact the Energy Storage Tax Incentive and Deployment Act, a common-sense bill that will encourage investment, jobs and accelerated deployment of solar plus storage projects.”

Continue Reading
Advertisement
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Product News

EnerVenue signs 11 MWh lithium-free nickel-hydrogen battery order in China

EnerVenue has won its first multi-megawatt-hour order: 26 Energy Prism units totalling 11 MWh for a major Chinese oil and gas producer.

Published

on

Illustration of EnerVenue Energy Prism battery units at an oil and gas site

EnerVenue, developer of lithium-free nickel-hydrogen batteries, has signed its first multi-megawatt-hour commercial order: 11 MWh with a major Chinese oil and gas producer. Announced on 23 September 2026, the order covers 26 containerised Energy Prism units that will store solar power at an oilfield in northern China.

Shifting daytime solar to peak hours

According to the company, the systems will shift the site’s daytime solar output to peak demand hours. Three units will ship in December 2026 and 23 in March 2027. The customer was not named; EnerVenue says safety was the primary selection factor.

Water-based, non-flammable electrolyte

The Energy Prism units use EnerVenue’s fourth-generation Aqueous Metal Cell (AMC), a nickel-hydrogen chemistry with a water-based, non-flammable electrolyte, designed for 30,000 charge cycles – up to three cycles a day for 30 years. The company says the cells passed UL 9540A fire propagation testing with no fire at cell level.

CEO Henning Rath said an oil and gas producer does not put new technology on a working site unless it is completely satisfied that the safety case is sound. CTO Dr Majid Keshavarz said the AMC chemistry does not produce the progression of events that leads to ignition, fire or explosion.

New line in Changzhou

The units will be made at the company’s new facility in Changzhou, Jiangsu, which opened on 24 September 2026. Phase 1 capacity is 250 MWh a year, with plans to reach 1 GWh in 2027.

Sources

  • EnerVenue, “EnerVenue Signs 11 MWh Lithium-Free Battery Order in China”, press release, 23.09.2026 – enervenue.com

Illustrative image: EnerVenue

Continue Reading

Sector News

Gotion ships storage systems for Egypt’s Nefertiti and Horus projects within three months

Gotion dispatched Gotion Grid 5 MWh systems for AMEA Power’s Nefertiti and Horus projects in Egypt just three months after contract signing.

Published

on

Trucks carrying Gotion Grid 5 MWh energy storage systems departing for Egypt

Chinese battery manufacturer Gotion High-Tech has started delivering what it describes as Africa’s largest AC-coupled energy storage project: Gotion Grid 5 MWh systems for the Nefertiti and Horus storage projects in Egypt. According to the company’s 30 September 2026 release, only three months passed between contract signing and the departure of the first shipment.

50 trucks from Jinzhai and Nantong

On 28 September 2026, 50 heavy-duty trucks carrying Gotion Grid 5 MWh systems left Gotion’s Jinzhai and Nantong facilities in China. The Nefertiti and Horus projects, developed by AMEA Power and built by China Energy Engineering Group, are Egypt’s first large-scale standalone storage facilities.

Full DC-to-AC integration

Gotion says the systems are supplied with full DC-to-AC integration, including in-house cells, battery management systems, DC systems, power conversion systems and transformers. They are designed for extreme heat, sandstorms and salt fog – conditions typical of the project sites.

A step into the Middle East and North Africa

Hussain Al Nowais, Chairman of AMEA Power, said the shipment opens a new stage of broader cooperation and that the company is proud of and satisfied with its partnership with Gotion. Li Chen, Senior Vice President of Gotion, called Egypt a key step for Gotion into the Middle East and North Africa, proving it can deliver end-to-end, operate locally and commit for the long term.

Sources

  • Gotion High-Tech, “Gotion Delivers Africa’s Largest AC-Coupled Storage Project in Just 3 Months”, press release (PR Newswire), 30.09.2026 – prnewswire.com

Image: Gotion High-Tech

Continue Reading

Sector News

Greenvolt starts construction of 2.4 GWh Siedlce battery storage project in Poland

Greenvolt Power has begun building the 600 MW / 2.4 GWh Siedlce project with BYD batteries – set to be Poland’s largest battery storage facility.

Published

on

Groundbreaking ceremony for Greenvolt's Siedlce battery storage project in Poland

Greenvolt Power has started construction of the 600 MW / 2.4 GWh Siedlce battery energy storage project in Poland. Announced on 24 September 2026, the project will become Poland’s largest and one of Europe’s largest battery storage facilities, according to the company. Commercial operation is planned for the end of 2027.

210 battery containers from BYD

According to Greenvolt, BYD Energy Storage is supplying the batteries. The facility will comprise 210 battery containers and 105 transformer containers with power conversion systems. P&Q is responsible for engineering and construction and ONDE for the electrical infrastructure.

1 GW / 4 GWh in Poland

Greenvolt’s 200 MW / 800 MWh Turośń Kościelna facility has been operating since July 2026, while the Ełk project of the same size is expected online in the fourth quarter of 2026. Together with Siedlce, the three projects will total 1 GW / 4 GWh. The company’s probability-weighted BESS pipeline stands at around 4.6 GW, of which about 2.4 GW is in Poland.

João Manso Neto, CEO of Greenvolt Group, said that with Siedlce the company is once again moving from plans to delivery, adding that Poland is a key market and battery storage is becoming an increasingly important part of its growth.

Sources

  • Greenvolt, “Greenvolt begins construction of one of Europe’s largest battery energy storage projects”, press release, 24.09.2026 – greenvolt.com

Image: Greenvolt

Continue Reading
Advertisement
Advertisement

Trending